<?xml version="1.0" encoding="utf-8"?>        <rss version="2.0"
            xmlns:content="http://purl.org/rss/1.0/modules/content/"
            xmlns:dc="http://purl.org/dc/elements/1.1/"
            xmlns:atom="http://www.w3.org/2005/Atom">
            <channel>
                <atom:link href="https://english.dainikjagranmpcg.com/india-infrastructure/tag-15493" rel="self" type="application/rss+xml" />
                <generator>Dainik Jagran English RSS Feed Generator</generator>
                <title>India Infrastructure - Dainik Jagran English</title>
                <link>https://english.dainikjagranmpcg.com/tag/15493/rss</link>
                <description>India Infrastructure RSS Feed</description>
                
                            <item>
                <title>Bhopal Metro Set for Faster Operations as Signalling System Nears Launch</title>
                                    <description><![CDATA[<p>Metro services are expected to run on both tracks from July, with improved frequency and a revised timetable awaiting final safety clearance</p>]]></description>
                
                                    <content:encoded><![CDATA[<a href="https://english.dainikjagranmpcg.com/states/madhya-pradesh/bhopal-metro-set-for-faster-operations-as-signalling-system-nears/article-20244"><img src="https://english.dainikjagranmpcg.com/media/400/2026-06/bhopal-metro-.jpg" alt=""></a><br /><p class="isSelectedEnd">Bhopal Metro is preparing for a major operational upgrade that is expected to improve train speed, frequency, and overall passenger convenience. The signalling system on the priority corridor between Subhash Nagar and AIIMS has been completed, paving the way for metro services to begin operating on both tracks from July, subject to final approval from safety authorities.</p>
<p class="isSelectedEnd">Officials associated with the project said the Commissioner of Metro Rail Safety (CMRS) has been invited to conduct the final inspection. The inspection team is expected to visit the corridor in the coming days. Once the required safety certification is granted, metro authorities plan to introduce a revised operating schedule and increase the number of train services.</p>
<p class="isSelectedEnd">The development comes as Bhopal Metro has faced criticism in recent months over its limited operating hours, low frequency, and comparatively slow service. At present, trains are running on only one track, resulting in longer waiting times for passengers.</p>
<h3>Signalling Upgrade to Boost Capacity</h3>
<p class="isSelectedEnd">Industry experts describe the signalling system as one of the most critical components of any metro network. It controls train movement, regulates speed, maintains safe distances between trains, and enables efficient multi-track operations.</p>
<p class="isSelectedEnd">Until now, the absence of a fully operational signalling system meant that Bhopal Metro had to run trains on a single track. As a result, trains travelling in both directions were using the same line, limiting operational efficiency and reducing service frequency.</p>
<p class="isSelectedEnd">With the signalling work now complete, metro services will be able to utilize both tracks simultaneously. This is expected to significantly improve operational flexibility and reduce passenger waiting times.</p>
<h3>Technology Similar to Delhi Metro</h3>
<p class="isSelectedEnd">According to officials, the system being introduced in Bhopal Metro is based on modern signalling technology used in leading urban transit networks, including the Delhi Metro. The technology allows better train management, shorter headways between services, and enhanced safety standards.</p>
<p class="isSelectedEnd">The newly completed signalling infrastructure covers the approximately 7-kilometre priority corridor between Subhash Nagar and AIIMS. It forms part of a larger signalling package designed for metro networks in both Bhopal and Indore.</p>
<p class="isSelectedEnd">Transportation experts believe the upgrade will allow metro authorities to make better use of existing infrastructure while improving reliability and passenger experience.</p>
<h3>Benefits for Commuters</h3>
<p class="isSelectedEnd">The introduction of the new system is expected to bring several improvements for daily commuters. Train frequency is likely to increase substantially, reducing the current waiting period between services. Metro authorities will also be able to schedule operations more efficiently during peak office hours.</p>
<p>Passengers are expected to benefit from faster journeys, more predictable schedules, and greater service availability throughout the day. Officials hope the improvements will encourage higher ridership and strengthen public confidence in the metro system.</p>]]></content:encoded>
                
                                                            <category>States</category>
                                            <category>Madhya Pradesh</category>
                                    

                <link>https://english.dainikjagranmpcg.com/states/madhya-pradesh/bhopal-metro-set-for-faster-operations-as-signalling-system-nears/article-20244</link>
                <guid>https://english.dainikjagranmpcg.com/states/madhya-pradesh/bhopal-metro-set-for-faster-operations-as-signalling-system-nears/article-20244</guid>
                <pubDate>Wed, 17 Jun 2026 08:13:27 +0530</pubDate>
                                    <enclosure
                        url="https://english.dainikjagranmpcg.com/media/2026-06/bhopal-metro-.jpg"                         length="232616"                         type="image/jpeg"  />
                
                                    <dc:creator><![CDATA[Rishita ]]></dc:creator>
                            </item>
            <item>
                <title>Indian Railways 2026-27: Hydrogen Train, Vande Bharat &amp; New Rules</title>
                                    <description><![CDATA[<p dir="ltr"><strong>Indian Railways unveils 8 major changes for 2026-27 — hydrogen train launch, 12 Vande Bharat Sleeper trains, new refund rules, and full network electrification on the horizon.</strong></p>
<p> </p>]]></description>
                
                                    <content:encoded><![CDATA[<a href="https://english.dainikjagranmpcg.com/business/indian-railways-2026-27-hydrogen-train-vande-bharat-new-rules/article-16778"><img src="https://english.dainikjagranmpcg.com/media/400/2026-04/indian-railways-2026-27-hydrogen-train,-vande-bharat-&amp;-new-rules.jpg" alt=""></a><br /><p dir="ltr"><strong>Indian Railways Set for 8 Major Overhauls in 2026-27, Including First Hydrogen Train</strong></p>
<p dir="ltr">From India's first hydrogen-powered train to stricter ticket refund rules, Indian Railways is rolling out sweeping upgrades this financial year that will reshape how millions travel across the country.</p>
<p dir="ltr">Indian Railways is gearing up for one of its most ambitious annual transformation drives, with the Ministry of Railways confirming eight landmark changes for the financial year 2026-27. The changes range from the commercial launch of the country's first hydrogen-powered train to a revised ticket cancellation policy taking effect April 15 — affecting hundreds of millions of passengers annually.</p>
<p dir="ltr">Refund Rules Tightened from April 15</p>
<p dir="ltr">Under the revised cancellation policy, passengers must now cancel tickets at least eight hours before a train's scheduled departure to qualify for any refund — double the earlier four-hour window. Those who cancel between 8 and 24 hours before departure will receive 50% of the fare. Tickets cancelled within the 8-hour window will attract no refund, according to official communication from the Railways Ministry.</p>
<p dir="ltr">Cancel from Any Station Counter</p>
<p dir="ltr">In what is being seen as a significant passenger-friendly step, counter-purchased tickets can now be cancelled at any railway station across the country — not just the originating or last booking station. This change is expected to benefit passengers travelling in remote areas or those who have already reached an intermediate city.</p>
<p dir="ltr">Boarding Station Changes Go Digital</p>
<p dir="ltr">Passengers will soon be able to modify their boarding station digitally up to 30 minutes before a train departs from its originating point. Previously, such changes were only permitted before the charting process began. The move directly addresses a persistent pain point where passengers miss trains at their scheduled stop but have no recourse to board at the next station on a confirmed ticket.</p>
<p dir="ltr">An in-train class upgrade feature is also being introduced under the same digital overhaul — allowing passengers to shift from Sleeper to an AC class up to 30 minutes before departure, subject to seat availability.</p>
<p dir="ltr">Hydrogen Train Trial Completed Successfully</p>
<p dir="ltr">India's first hydrogen train — described by officials as the world's longest and most powerful of its kind — has successfully completed trials between Jind and Sonipat in Haryana. The Research Design and Standards Organisation (RDSO) supervised the trials of the 10-coach, 2400kW rake, which emits only water vapour during operation. The train is projected to cost around ₹80 crore and is expected to enter commercial service during the current financial year.</p>
<p dir="ltr">12 Vande Bharat Sleeper Trains This Year</p>
<p dir="ltr">Railways Minister confirmed that 12 Vande Bharat Sleeper trains will be deployed for long-distance routes in 2026-27. Two of these have already begun operations on the Howrah-Kamakhya corridor. Each rake carries 16 coaches — 11 in Third AC, four in Second AC, and one First AC — designed to cover distances of 1,000 to 1,500 kilometres.</p>
<p dir="ltr">Indo-Russian joint venture Kinet Railway Solutions is expected to deliver its first prototype by June 2026 under a 120-train contract, while Titagarh Rail Systems, in partnership with BHEL, is building 80 rakes. As a reference point, the Third AC fare between Guwahati and Howrah has been set at ₹2,300 — well below air travel costs on the same route, which typically range between ₹6,000 and ₹10,000, as per ministerial statements.</p>
<p dir="ltr">75 New Passenger Holding Areas Planned</p>
<p dir="ltr">Following the success of dedicated waiting facilities at New Delhi Railway Station, the Ministry of Railways has cleared the construction of Passenger Amenity Centres — commonly referred to as holding areas — at 75 additional major stations. These are earmarked for completion by March 2027 and aim to reduce overcrowding on platforms during peak travel periods.</p>
<p dir="ltr">Electrification Nears 100%</p>
<p dir="ltr">The Indian Railways broad gauge electrification project is at the final stretch, with 99.2% of the network already electrified across 25 states and union territories. The ministry has set a target to achieve complete electrification by the end of this financial year — a milestone that would significantly cut diesel consumption and reduce the network's carbon footprint.</p>
<p dir="ltr">Taken together, these changes reflect a coordinated push by Indian Railways to modernise passenger experience, reduce environmental impact, and improve operational efficiency. Whether the hydrogen train launch meets its 2026-27 target or the new refund policy results in fewer last-minute cancellations will be closely watched by commuters and industry observers across the country.</p>
<p> </p>]]></content:encoded>
                
                                                            <category>National</category>
                                            <category>Business</category>
                                    

                <link>https://english.dainikjagranmpcg.com/business/indian-railways-2026-27-hydrogen-train-vande-bharat-new-rules/article-16778</link>
                <guid>https://english.dainikjagranmpcg.com/business/indian-railways-2026-27-hydrogen-train-vande-bharat-new-rules/article-16778</guid>
                <pubDate>Sun, 12 Apr 2026 14:57:32 +0530</pubDate>
                                    <enclosure
                        url="https://english.dainikjagranmpcg.com/media/2026-04/indian-railways-2026-27-hydrogen-train%2C-vande-bharat-%26-new-rules.jpg"                         length="132890"                         type="image/jpeg"  />
                
                                    <dc:creator><![CDATA[Abhishek Joshi]]></dc:creator>
                            </item>

            </channel>
        </rss>
        