<?xml version="1.0" encoding="utf-8"?>        <rss version="2.0"
            xmlns:content="http://purl.org/rss/1.0/modules/content/"
            xmlns:dc="http://purl.org/dc/elements/1.1/"
            xmlns:atom="http://www.w3.org/2005/Atom">
            <channel>
                <atom:link href="https://english.dainikjagranmpcg.com/pwd-chhattisgarh/tag-16301" rel="self" type="application/rss+xml" />
                <generator>Dainik Jagran English RSS Feed Generator</generator>
                <title>PWD Chhattisgarh - Dainik Jagran English</title>
                <link>https://english.dainikjagranmpcg.com/tag/16301/rss</link>
                <description>PWD Chhattisgarh RSS Feed</description>
                
                            <item>
                <title>Kachna railway overbridge opening: Raipur bridge opens today</title>
                                    <description><![CDATA[<p dir="ltr"><em><strong>The Kachna railway overbridge opening today brings major relief to 3 lakh Raipur residents, ending an 8-year wait and frequent traffic jams.</strong></em></p>
<p> </p>]]></description>
                
                                    <content:encoded><![CDATA[<a href="https://english.dainikjagranmpcg.com/states/chhattisgarh/kachna-railway-overbridge-opening-raipur-bridge-opens-today/article-19042"><img src="https://english.dainikjagranmpcg.com/media/400/2026-05/kachna-railway-overbridge-opening-raipur-bridge-opens-today.jpg" alt=""></a><br /><h2 dir="ltr">Kachna railway overbridge opening: Relief for 3 lakh commuters in Raipur after 8 years</h2>
<h3 dir="ltr">Long wait ends today</h3>
<p dir="ltr">The long-standing traffic woes of over three lakh residents in Raipur are set to end this evening as the Kachna railway overbridge opens to the public after an eight-year delay. Chief Minister Vishnu Deo Sai will officially inaugurate the newly constructed overbridge at 6 PM today, throwing it open for regular vehicular movement immediately after the ceremony.</p>
<p dir="ltr">Final preparations, including the installation and testing of streetlights, continued late into Thursday night to ensure the structure was ready for the high-profile launch. While the blacktopping and structural work were wrapped up by May 7, finishing touches were being given until the last minute.</p>
<h3 dir="ltr">Traffic diversion announced</h3>
<p dir="ltr">Local authorities have issued a traffic advisory ahead of the inauguration ceremony. Vehicle movement on the Khamhardih-Kachna road will remain diverted between 5 PM and 8 PM today to facilitate the event.</p>
<p dir="ltr">Commuters travelling from Anupam Nagar to Kachna are advised to take the Shriram Nagar overbridge route via the BSNL office. Similarly, traffic heading towards Khamhardih from Kachna will be rerouted through the same detour. Public Works Department (PWD) Minister Arun Sao, local MLAs, and municipal corporators are scheduled to attend the event alongside the Chief Minister.</p>
<h3 dir="ltr">End to frequent bottlenecks</h3>
<p dir="ltr">The Kachna railway crossing had become one of the worst traffic bottlenecks in the city due to a massive surge in rail traffic over the last decade. According to railway data, nearly 120 passenger and freight trains pass through this section every 24 hours.</p>
<p dir="ltr">“The gate used to close every 15 minutes on average, leading to massive tailbacks on both sides,” said a regular commuter from the area.</p>
<p dir="ltr">During peak hours, hundreds of motorists, school buses, and emergency vehicles found themselves stranded in the scorching heat and monsoon downpours. The opening of the Kachna railway overbridge opening will eliminate these frequent operational halts entirely.</p>
<h3 dir="ltr">Changing footprint of Raipur</h3>
<p dir="ltr">When the PWD initially conceptualized the project nearly eight years ago, Kachna was largely considered the outer periphery of Raipur with manageable traffic volume. However, rapid urban expansion has transformed the landscape.</p>
<p dir="ltr">The area has seen an explosion of residential projects, housing thousands of families. Major residential pockets, including VIP State, Ashoka Ratan, Kachna Housing Board, Baradera, Jora, Chandinagar, Parvati Nagar, and Bhavna Nagar, which were hit hardest by the daily delays, stand to benefit directly from this infrastructure upgrade.</p>
<h3 dir="ltr">Project cost and specifications</h3>
<p dir="ltr">Built at an estimated cost of ₹35 crore, the new two-lane overbridge spans a total length of 871 meters and features a width of 12 meters. The structure originates just past the CSEB office in Khamhardih and terminates near the Housing Board Colony in Kachna, providing a seamless bypass over the busy railway tracks.</p>
<h3 dir="ltr">Better connectivity ahead</h3>
<p dir="ltr">The commissioning of the Kachna bridge ties into a broader infrastructure push targeting Raipur’s eastern and northern sectors. The state government is already planning an ambitious 14.7-km Expressway-2 project connecting Mova to Jora.</p>
<p dir="ltr">Estimated to cut travel time to Nawa Raipur and the airport down to just 10 minutes, the proposed corridor will feature double-decker flyovers to bypass seven major traffic intersections, signaling a major overhaul for the city's transport network.</p>
<p> </p>]]></content:encoded>
                
                                                            <category>States</category>
                                            <category>Chhattisgarh</category>
                                    

                <link>https://english.dainikjagranmpcg.com/states/chhattisgarh/kachna-railway-overbridge-opening-raipur-bridge-opens-today/article-19042</link>
                <guid>https://english.dainikjagranmpcg.com/states/chhattisgarh/kachna-railway-overbridge-opening-raipur-bridge-opens-today/article-19042</guid>
                <pubDate>Fri, 22 May 2026 15:07:29 +0530</pubDate>
                                    <enclosure
                        url="https://english.dainikjagranmpcg.com/media/2026-05/kachna-railway-overbridge-opening-raipur-bridge-opens-today.jpg"                         length="104880"                         type="image/jpeg"  />
                
                                    <dc:creator><![CDATA[Abhishek Joshi]]></dc:creator>
                            </item>
            <item>
                <title> Bilaspur High Court Slams PWD Over Road Delays in Chhattisgarh</title>
                                    <description><![CDATA[<p dir="ltr"><strong> The Chhattisgarh High Court expressed strong displeasure over road construction delays in Bilaspur, directing PWD and civic officials to submit progress reports with timelines.</strong></p>
<p> </p>]]></description>
                
                                    <content:encoded><![CDATA[<a href="https://english.dainikjagranmpcg.com/states/chhattisgarh/-bilaspur-high-court-slams-pwd-over-road-delays-in/article-16942"><img src="https://english.dainikjagranmpcg.com/media/400/2026-04/bilaspur-high-court-slams-pwd-over-road-delays-in-chhattisgarh.jpg" alt=""></a><br /><h1 dir="ltr">Chhattisgarh High Court Raps PWD Over Bilaspur Road Delays</h1>
<p> </p>
<h2 dir="ltr">Public Cannot Be Made to Suffer Over Procedural Delays, Court Says</h2>
<h2 dir="ltr">Court Takes Strong Exception</h2>
<p dir="ltr">The Chhattisgarh High Court has come down hard on the Public Works Department (PWD) over persistent delays in road construction across Bilaspur, warning that procedural formalities cannot be used as a shield to keep citizens in distress. A Division Bench comprising Chief Justice Ramesh Sinha and Justice Ravindra Kumar Agarwal heard the matter and made clear that essential public infrastructure cannot be held hostage to bureaucratic processes.</p>
<h2 dir="ltr">PIL Taken Up Suo Motu</h2>
<p dir="ltr">The court took up the issue as a public interest litigation after media reports highlighted the deteriorating condition of roads in the city. Treating the news coverage as sufficient grounds to intervene, the Division Bench initiated proceedings and called upon the authorities to explain why work had stalled or moved at a sluggish pace. The bench underscored that delays in basic civic amenities like motorable roads directly affect the daily lives of ordinary residents.</p>
<h2 dir="ltr">PWD Tables Status Report</h2>
<p dir="ltr">During the hearing, the PWD's Superintending Engineer submitted a status report along with an affidavit, revealing that tenders worth ₹44.59 crore were still caught in procedural stages. As per the report, a tender of approximately ₹40.38 crore for the Pendridih to Nehru Chowk stretch — spanning 15.37 kilometres — was issued on April 9, with May 4 set as the last date for submissions.</p>
<p dir="ltr">For the Devkinandan Chowk to Mahamaya Chowk stretch of 1.30 kilometres, tenders worth around ₹1.84 crore had been invited with a deadline of April 15. Meanwhile, technical approval for the Nehru Chowk to Uslapur corridor of 3.20 kilometres — a project valued at ₹4.20 crore — has been secured, and the draft Notice Inviting Tender (NIT) has been dispatched for further processing.</p>
<h2 dir="ltr">Civic Body Updates Court on Ground Progress</h2>
<p dir="ltr">The Municipal Commissioner submitted a separate affidavit informing the court that tarring work along the Apollo Chowk to Mansi Guest House route has been completed. Additionally, shifting of electricity poles and drainage construction between Rajkishore Nagar Chowk and Sant Vihar Chowk up to Apollo Chowk are also reported as done.</p>
<p dir="ltr">Currently, work between Mansi Guest House and Rapata Chowk is ongoing, with officials citing encroachment removal and tree transplantation as activities in progress. The court took note of these updates but refrained from treating partial completions as satisfactory given the broader scale of pending work.</p>
<h2 dir="ltr">Court Sets Firm Accountability Frame</h2>
<p dir="ltr">The bench has directed both the Municipal Commissioner and the PWD's Executive Engineer to appear before the court with detailed progress reports ahead of the next hearing. These reports must include a clear timeline for completing the pending stretches. The court left no ambiguity — officials are expected to move beyond submitting status notes and demonstrate concrete execution on the ground.Industrial Bodies Also Called to Account</p>
<p dir="ltr">Beyond road infrastructure, the High Court has extended its scrutiny to matters related to industrial development in the region. The Division Bench directed the Managing Director of the Chhattisgarh State Industrial Development Corporation (CSIDC) and the General Manager of the District Trade and Industries Centre to file personal affidavits in the case. Both officials will need to respond with sworn statements before the next date of hearing.</p>
<h2 dir="ltr">What Comes Next</h2>
<p dir="ltr">The matter is set to come up for hearing again shortly, with multiple departments now under the court's watchful eye. According to sources, the court's intervention has prompted officials at various levels to fast-track at least some of the stalled tenders. However, residents and civic activists say on-ground improvement remains the true benchmark — and that, as of now, much of Bilaspur's road network continues to test the patience of its daily commuters.</p>
<p dir="ltr">With the Bilaspur High Court maintaining pressure through direct judicial oversight, this road construction delay case has become a significant marker of how courts in India are increasingly stepping in where routine governance has fallen short on delivering basic civic amenities.</p>
<p dir="ltr"> </p>
<p> </p>]]></content:encoded>
                
                                                            <category>States</category>
                                            <category>Chhattisgarh</category>
                                    

                <link>https://english.dainikjagranmpcg.com/states/chhattisgarh/-bilaspur-high-court-slams-pwd-over-road-delays-in/article-16942</link>
                <guid>https://english.dainikjagranmpcg.com/states/chhattisgarh/-bilaspur-high-court-slams-pwd-over-road-delays-in/article-16942</guid>
                <pubDate>Thu, 16 Apr 2026 12:23:16 +0530</pubDate>
                                    <enclosure
                        url="https://english.dainikjagranmpcg.com/media/2026-04/bilaspur-high-court-slams-pwd-over-road-delays-in-chhattisgarh.jpg"                         length="144333"                         type="image/jpeg"  />
                
                                    <dc:creator><![CDATA[Abhishek Joshi]]></dc:creator>
                            </item>

            </channel>
        </rss>
        