MLA Rameshwar Sharma Engages with Public Post-Pachmarhi Training, Reviews Development Projects
Bhopal,M.P
Following his participation in the BJP's training camp in Pachmarhi, MLA Rameshwar Sharma resumed fieldwork in Bhopal's Huzur constituency. He conducted on-site inspections of ongoing infrastructure projects, including the Bairagarh flyover and the Sant Hirdayaram Nagar double-decker elevated flyover, directing officials to expedite completion ahead of the monsoon season. Sharma emphasized the importance of timely project delivery to alleviate traffic congestion and improve public amenities.
After the BJP training camp held in Pachmarhi, Madhya Pradesh, MLA Rameshwar Sharma was seen in action. The BJP MLA came out on the ground to see the problems of the people and the progress of development works. Sharma visited his area with officials from 7 am on Tuesday.
MLA Rameshwar Sharma inspected the elevated flyover being built at a cost of Rs 305 crore in Sant Nagar, Bhopal and the ROB being built on Phatak Road. He gave various instructions to the officials regarding the construction of the flyover including the shifting of electric poles. During the inspection, MLA Rameshwar Sharma inspected the Lalghat grade separator, the elevated flyover being built on Sant Nagar Indore Road, ROB construction on Phatak Road, the Prime Minister's residence at Bhauri, the proposed sub-station of village Bairagarh and the 6-lane flyover site to be built on Bhopal bypass.
Let us tell you that Rameshwar Sharma is an MLA from the Huzur assembly seat of Bhopal. He has been continuously elected MLA since 2013. Rameshwar Sharma, who belongs to the RSS background, stays ahead with the agenda of Hindutva.